Grievance Description
Our ongoing executive engineer electricity distribution division second Mirzapur Mr Rajesh Kumar did not make a single effort to curb the theft of electricity which is rampant in the district Mirzapur. If he has participated in any move in disconnecting the overdue connection holders then he must include his efforts in the report submitted by him to close this grievance cum complaint. As far as my knowledge is concerned he has not participated in any move to curb the theft of electricity which is not exemplary to the subordinates.
An application under Article 51A of the constitution of India to make enquiry in regard to the theft of electricity which is in full swing under the ambit of electricity distribution division second Mirzapur. Why the department of electricity distribution division second is not installing the electronic metres outside the premises of the electricity consumers in order to curb the theft of the electricity? When the applicant had earlier made the application in this regard then it was informed to the applicant that efforts are being made in this direction and 50% electronic metres has been installed outside the premises. It is most surprising that new connection holders are installing the electronic metres inside the premises which is matter of most surprising. Such practises must be controlled by the executive Engineer electricity distribution division second Mirzapur but he is not careful to curb the theft of the electricity quite obvious from his lackadaisical approach in the matter.
There must be transparency and accountability in readings of the electric metres done by the metre readers and this metre reading will be easily accessible if the electric metres are installed outside the premises of the electricity connection holders. All those premises in which electric metres are installed inside the premises theft of electricity are in full swing. Such connection holders are indulged in the theft of electricity by operating coolers, fridges and air conditioners and later they manage the electricity bills by adjusting the electronic metres installed inside the premises.
Everyone knows that if there will be overload in the supply then wires will be burnt and conductors will also burn. There must be equilibrium between supply and consumption of electricity and here the increase in the consumption of electricity is because of the theft of electricity. On the one side of screen to control the theft of the electricity Uttar Pradesh Power corporation limited promotes the installation of the electric meters outside of the premises so that there maybe transparency and accountability in measuring the readings of the electric metre but on the other side of his screen certain staff at the department of electricity itself promoting the connection holders to keep their electric metres inside the premises so that corruption may be proliferated. Here this question arises as to why the electric metres are installed inside the premises of the connection holders when there is an obvious guideline of the Uttar Pradesh Power corporation limited to install the electric metres. सभी जानते हैं कि अगर आपूर्ति में ओवरलोड होगी तो तार जलेंगे और कंडक्टर भी जलेंगे। बिजली की आपूर्ति और खपत के बीच संतुलन होना चाहिए और यहां बिजली की खपत में वृद्धि बिजली की चोरी के कारण होती है। परदे के एक तरफ बिजली की चोरी को नियंत्रित करने के लिए उत्तर प्रदेश पावर कॉरपोरेशन लिमिटेड परिसर के बाहर बिजली के मीटर की स्थापना को बढ़ावा देता है ताकि बिजली मीटर की रीडिंग को मापने में पारदर्शिता और जवाबदेही हो लेकिन दूसरी तरफ उनके बिजली विभाग के भ्रष्ट कर्मचारी ही कनेक्शन धारकों को परिसर के अंदर अपने बिजली के मीटर रखने के लिए प्रोत्साहित करते हैं ताकि भ्रष्टाचार को बढ़ावा मिल सके। यहां यह सवाल उठता है कि कनेक्शन धारकों के परिसरों के अंदर बिजली के मीटर क्यों लगाए जाते हैं जबकि बिजली के मीटर लगाने के लिए उत्तर प्रदेश विद्युत निगम लिमिटेड की स्पष्ट गाइडलाइन है।
Current Status
Case closed
Date of Action
05/07/2023
Remarks
अधीनस्थ अधिकारी के स्तर पर निस्तारित अधीनस्थ अधिकारी के स्तर पर निस्तारित अधीनस्थ अधिकारी के स्तर पर निस्तारित अधीनस्थ अधिकारी के स्तर पर निस्तारित complaint no 60000230113012 is closed complaint no 60000230113012 is closed
Reply Document
Rating
1
Poor
Rating Remarks
कार्यालय अधिशासी अभियन्ता विद्युत वितरण खण्ड-द्वितीय, पूर्वान्चल विद्युत वितरण निगम लिमिटेड, फतहों, मीरजापुर पत्रांक 3969 वि०वि०ख० द्वि० (मी०) / विषय:- पी0जी0 पोर्टल सन्दर्भ सं0 60000230113012 के सम्बन्ध में। दिनांक 5/07/202 अभियन्त विद्युत वितरण मण्डल, मीरजापुर। श्री योगी एम०पी० सिंह निवासी मुहल्ला- सुरेकापुरम कालोनी, श्री लक्ष्मी नारायण बैकुंठ महादेव मन्दिर जिला- मीरजापुर द्वारा की गई शिकायत के सम्बन्ध में अवगत कराना है कि विद्युत विच्छेदन की कार्यवाही विभागीय नियमानुसार किया जा रहा है। शिकायतकर्ता द्वारा जहाँ तक मीटर उपभोक्ताओं के परिसर के अन्दर लगाये जाने की बात की गई है, के सम्बन्ध में अवगत कराना है कि ज्यादातर मीटर उपभोक्ताओं के परिसर के बाहर लगाये गये हैं, कुछ उपभोक्ताओं के परिसर पर जहाँ मीटर परिसर के अन्दर लगाये जाने की सूचना मिलती है, उन मीटरों को परिसर के बाहर लगवा दिया जाता है। मीटर लगाने का कार्य कार्यालय अधिशासी अभियन्ता, विद्युत परीक्षण खण्ड, जंगीरोड, मीरजापुर द्वारा किया जाता है। (राजेश कुमार) अधिशासी अभियन्ता पत्राक /वि०वि०ख०-द्वि०मी०) / तदिनांक
Appeal Details
Appeal Number
Date of Receipt
Appeal Text
Current Status
Officer Concerns To
Officer Name
Shri Bhaskar Pandey (Joint Secretary)
Organisation name
Government of Uttar Pradesh
Contact Address
Chief Minister Secretariat , Room No. 321, U.P. Secretariat, Lucknow
Email Address
bhaskar.12214@gov.in
Contact Number
05222226350
Comments
Post a Comment
Your view points inspire us